Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13604122
| No.13604122
- Product Categories
- Friendly Links
| Information Name: | Shanxi boiler plant, lofty Tai boiler (certified), Shanxi boiler |
| Published: | 2014-11-25 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Shanxi boiler plant, lofty Tai boiler (certified), Shanxi boiler provided by Tai Hong Boiler Co., Ltd. Zhoukou City lofty. Zhoukou City lofty Tai Hong Boiler Co., Ltd. (www.hnydtkglc.com) is specialized in "green coal-fired boiler fuel gas hot water boiler environmental non-conducting oil furnace hot stove" of the enterprise, the company of "honesty, hard service" concept provide you with the highest quality products and services. Welcome to inquire! Contact: Liu Xue Yang. Production process Zhoukou City lofty Tai Hong Boiler Co. manufacturing plant is our manufacturing base of the boiler. On the type of boiler accessories are concerned there are about 100 kinds, count bolts, screws, using more than 600 parts. Only when all the parts manufacturing processes in accordance with a properly fitted in a correct position, can only produce a boiler. Our factory, boiler production is mainly made up of five production process consists of: cutting rolling, welding, testing, assembly, final assembly. By cutting rolled steel plate cutting, pressure processing, large-scale production of boiler drum parts. By repeatedly corrected, completed steel blanking, cutting, drilling, drawing, shaping and other processes. Body welding and welding parts. Welding production mainly uses the automatic welding and manual welding hybrid production process. Inspection (quality control points) the main pressure parts welded X-ray inspection to identify the welding problems due to various circumstances, the general problem to be repaired, the repair of secondary failure of the workpiece will be banned. This work also by the local boiler inspection by staff supervision, in order to see the film images smoothly into the next process after passing. Assembled for testing after passing the cylinder, accessories docking assembly Shanxi heating boilers, complete all the tasks before the assembly, the assembly according to the production process requires good record, fill in the relevant information. Final assembly of the boiler parts assembly and commissioning. Assembly including exterior assembly, pressure test (supervised by the quality inspection department staff), boiler inspection by the producer nameplate, supervision and inspection certificate issued. First, the structure of the condensate without pressure indirectly heated hot water boiler structure and the lower half of the ordinary, like boilers, combustion chamber and heat transfer tubes; the upper part is equipped with a heat exchanger, furnace upper expansion tank installed there, due to the overall boiler Under a non-pressure state, Absolute Security, Shanxi condenser boiler installation backpass improve sales. Furnace heat medium water, in the course of the boiler running into, not only the heat transfer and heat exchangers. Shell and tube heat exchangers in strict accordance with the manufacturing standards for manufacturing heat exchangers, shell and tube, respectively, for the hydrostatic test. Second, the unit without pressure operation, safe and reliable boiler expansion tank has the upper water level automatic control, no pressure operation, safety and reliability, simplify complex approval procedures. Third, the long life of boiler water as a heat carrier is only used at run time, the oxygen in the water is heated to precipitate out of the furnace, the furnace will not happen long-term use oxygen corrosion, water was added in one heat medium, has a limited amount of calcium and magnesium ions heats, running water to rise Shanxi furnace boiler prices, so scaling occurs inside the boiler does not extend the life of the boiler, the boiler is more than two times the normal life, up to 20 years. Fourth, compact, easy to install, works without pressure indirect costs province condensation heating hot water boilers modular design, high-performance heat exchanger assembly Shanxi Boiler Company, compact unit structure, easy to transport you to inspect, install, in a small space, multiple the unit can be used in parallel, the process system is also very brief introduction, replacing the design and construction engineering costs province heat station. |
Admin>>>
You are the 21008 visitor
Copyright © GuangDong ICP No. 10089450, Zhoukou City lofty Tai Hong Boiler Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21008 visitor
Copyright © GuangDong ICP No. 10089450, Zhoukou City lofty Tai Hong Boiler Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

